Advice · Interior design
Open-plan or semi-open kitchen: the glass partition, the right compromise
8 October 2026 · 5 min read · By the Aldeak team

Opening the kitchen onto the living room remains one of the most requested renovation projects. But opening everything up is not always the best idea: a glass partition often offers the best of both worlds.
The open-plan kitchen: conviviality and light
Opening up the kitchen lets you cook without leaving your family or guests, enjoy the light from the living room and gain a sense of space. With a central island, the kitchen becomes the heart of the home.
Its limitations are well known: smells and noise spread, and the kitchen must stay tidy since it can be seen from the living room. A good extractor hood, properly sized and ideally vented to the outside, is essential.
Air also needs thinking about. Since the French order of 24 March 1982, a home must have general, continuous ventilation, with extraction in the kitchen. When the kitchen opens onto the living room, the extract vent stays in the cooking area: air comes in through the living spaces and leaves through the kitchen, carrying smells and water vapour with it. A hood does not replace ventilation: it adds to it while you are cooking.
The glass partition: separating without closing in
An industrial-style glass partition, in steel or aluminium, lets light through while keeping out smells and noise. It can be fixed, fitted with a door, or mounted on a low wall that holds the worktop. It also adds character, especially in an older house.
A few choices make a difference in everyday life. Laminated glazing withstands knocks better and reduces noise more than single glazing. Slim frames let more light through, while wider frames give a more industrial feel. And a sliding door built into the partition avoids the swing of a hinged door in a room that is often busy. The colour of the frames is chosen with the rest of the room: black remains the most requested, but a bronze shade or a colour close to the walls, as explained in our article on the colours that give a house character, makes the partition more discreet.
The semi-open kitchen
Between the two, a partial opening, a widened serving hatch or an island marking the boundary with the living room keeps a visual connection without opening everything up. It is often the solution when you want to keep a wall for storage.
The most space and light, but noise and smells everywhere. For those who entertain often and cook light dishes.
Light passes through, smells and noise much less so. The right compromise in most family homes.
A visual connection without knocking everything down. Useful when the wall holds storage or part of the structure.
What to check before knocking down a partition wall
- Is the wall load-bearing? If so, opening it requires a structural survey and the installation of a correctly sized beam or lintel. In a jointly owned building, the approval of the co-owners' general meeting may be required.
- Services: water supply, waste pipes, gas and electricity sometimes need to be moved.
- Heating and ventilation: a large volume heats differently, and the ventilation must be adapted.
- The floor: two different floor coverings often meet where the partition used to be.
In a jointly owned building, nothing is demolished before the vote. A load-bearing wall is generally part of the common areas: works affecting it require the authorisation of the general meeting, by the majority set out in Article 25 of the French law of 10 July 1965. So allow for the time until the next general meeting in your schedule.
The stages, in order
Opening up a kitchen affects the structure, the services and the finishes. The order matters as much as the choice of glass partition.
- The visit and the survey: we locate the load-bearing walls, the services and the direction of the floor joists.
- The structural study, if the wall is load-bearing: a structural engineering firm sizes the beam and its supports.
- The authorisations: a vote in a jointly owned building, or nothing at all in a house if the façade does not change.
- Demolition and structural work, with propping during the works.
- The services: plumbing, electricity, hood extraction, ventilation.
- Floors and walls, then fitting the glass partition and the kitchen.
VAT, an item worth checking
On a renovation quote, VAT is not the same everywhere. In a home completed more than two years ago, improvement works benefit from a reduced rate, which affects the final budget.
Worked example: VAT on opening-up works
Let us take, by way of example, a house completed more than two years ago and an invoice of €12,000 excluding VAT for demolishing the partition, the beam, the electrics and fitting a glass partition. This amount is chosen for the calculation, it is not a price. These improvement works fall under 10% VAT, provided the company supplies and fits the materials.
| Works excluding VAT | €12,000 |
| VAT at 10% | €1,200 |
| The same invoice at 20% | €14,400 incl. VAT |
| Total at 10% | €13,200 incl. VAT |
Furniture or appliances bought directly in a shop, however, remain at 20%.
Mistakes to avoid
- Demolishing before knowing whether the wall is load-bearing: even a light partition can carry a load in an older house.
- Forgetting the hood extraction: its route to the outside must be planned before the ceilings are closed.
- Keeping two poorly joined floors: a threshold strip in the middle of the living room is a constant reminder of the old partition.
- Underestimating the noise of the dishwasher and the hood when the kitchen opens onto the living room.
Opening up or separating the kitchen is often also an opportunity to rethink how you move around the whole house, as in our ideas for gaining space in small rooms or in the renovation of a Basque house with closed-off rooms. On our whole-house renovation projects, we coordinate these stages, from the wall survey to fitting the kitchen, so that a single point of contact oversees the entire project.
Sources : Loi n° 65-557 du 10 juillet 1965, article 25 (travaux touchant les parties communes ou l’aspect extérieur) · Arrêté du 24 mars 1982 relatif à l’aération des logements (ventilation générale et permanente, extraction en cuisine) · Code général des impôts, article 279-0 bis (TVA à 10 % pour l’amélioration des logements de plus de deux ans) · service-public.fr
Frequently asked questions
Do you need permission to open up a load-bearing wall?
In a detached house, no planning permission is needed if the façade does not change, but a structural survey is essential. In a jointly owned building, the approval of the co-owners' general meeting is generally required.
Does a glass partition block noise?
Partly. A glass partition with a door and laminated glazing noticeably reduces noise and smells, without cutting out the light.
Which extractor hood for an open-plan kitchen?
A powerful, quiet hood, ideally vented to the outside, sized according to the volume of the room.
What VAT rate applies to opening up a kitchen?
In a home completed more than two years ago, improvement works such as removing a partition or fitting a glass partition are charged at 10%, provided the company supplies and fits the materials. Purchases you make yourself in a shop remain at 20%.
How long do the works take?
It depends mainly on the structure: a simple partition comes down quickly, a load-bearing wall requires a survey, propping and a beam. The schedule is set after the visit, taking into account the manufacturing times for the glass partition and the kitchen.



